{"id":38026,"date":"2026-06-09T12:34:29","date_gmt":"2026-06-09T12:34:29","guid":{"rendered":"https:\/\/jammubulletin.com\/site\/?p=38026"},"modified":"2026-06-09T12:34:29","modified_gmt":"2026-06-09T12:34:29","slug":"rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work","status":"publish","type":"post","link":"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/","title":{"rendered":"Rs 6,800-Cr Zojila Tunnel Project In J&#038;K Achieves Breakthrough In Excavation Work"},"content":{"rendered":"<p>Drass\/ Minimarg, Jun 9 : The Rs 6,800-crore Zojila tunnel, Asia\u2019s longest tunnel connecting the Kashmir Valley to Ladakh, on Tuesday achieved a significant breakthrough with a blast breaking through the last 2.5 metres of the 13-km high-altitude infrastructure project that cuts through the Himalayas.<br \/>\nUnion Minister for Road Transport and Highways Nitin Gadkari performed the breakthrough blasting of the main tunnel being constructed at an altitude of 11,578 feet above sea level, around 24 km from Sonamarg and 103 km from Srinagar.<br \/>\nAddressing the media, the minister said the project is a lifeline for the people of Leh, Ladakh and Jammu and Kashmir. It is at a height of 3,000 metres and workers have given their contribution by working in temperatures as low as minus four degrees.<br \/>\nHe said 80 per cent of the workforce belongs to the region, and added that the project will provide all-weather connectivity to people of Ladakh region to Srinagar.<br \/>\nThe breakthrough blasting of the main tunnel was conducted at an equidistant of 6.5 km, providing access to East Portal (east side) to West Portal (west side).<br \/>\nJammu and Kashmir Lieutenant Governor Manoj Sinha and Chief Minister Omar Abdullah were also present on the occasion.<br \/>\nOfficials of the National Highways &amp; Infrastructure Development Corporation Limited (NHIDCL) said the breakthrough is six months ahead of schedule.<br \/>\nAs of now, about 85 per cent of the total work has been completed, Authority Engineer for the project, Yousef Es\u2019haghpour Rahimabadi, told PTI here.<br \/>\nThe tunnel is likely to be thrown open to the public in February 2028, the officials said, adding that after the breakthrough, the civil works will take another seven to eight months before the electrical works will begin.<br \/>\nThe tunnel, 9.5 metre wide, 7.57 metre high and 13.153 km long, is a horseshoe-shaped single-tube, a two-lane road tunnel built at the height of around 11,578 feet above sea level.<br \/>\nAbdullah appreciated the ministry for the Zojila tunnel project.<br \/>\n\u201cPeople of Ladakh region saw this dream long ago. It (connectivity) has been their dream for long.<br \/>\n\u201cBut no one was able to fulfil this dream. People had to face a lot of problems with respect to education, tourism, medical treatment,\u201d he said, adding that the tunnel will improve the lives of people.<br \/>\nHe also urged Gadkari to help in providing the region air connectivity as well in the future.<br \/>\nOnce completed, the bi-directional tunnel will significantly improve access to Drass, Kargil and Leh, while enhancing civilian mobility, logistics and regional connectivity in this strategically important area.<br \/>\nIn tunnelling, a breakthrough refers to the moment when teams involved in excavation work from both sides meet at a given point.<br \/>\n\u201cThe Zojila Tunnel is one of India\u2019s most challenging infrastructure projects taking shape in the heights of the Himalayas. Under the visionary leadership of Prime Minister Narendra Modi and the guidance of Union Minister for Road Transport and Highways Nitin Gadkari, Indian engineers have turned the challenges into an opportunity,\u201d the Ministry of Road, Transport and Highways said.<br \/>\nThe tunnel is also expected to boost economic activity, tourism and regional development. Besides, it will address transportation challenges through the Zojila Pass, which remains closed for several months every year due to heavy snowfall, avalanches and extreme weather conditions.<br \/>\nThe tunnel from Baltal in the Ganderbal district of central Kashmir to Minimarg in Drass district of the Union Territory of Ladakh has an 18-km approach road.<br \/>\nMegha Engineering and Infrastructure Limited (MEIL), the agency executing the project, used the New Austrian Tunnelling Method (NATM) to pierce through the Himalayas and navigate the fragile geology.<br \/>\nThe entire project is 31 km long, including the approach road and bridges, stretching from Sonmarg to Minimarg.<br \/>\nOnce operational, the tunnel would enhance both civilian and military mobility across the treacherous Zojila Pass that is usually rendered shut for traffic for three winter months due to heavy snowfall.<br \/>\nMEIL won the project from the NHIDCL and began constructing the tunnel in October 2020.<br \/>\nSpeaking further, Gadkari said that multiple rounds of bids were invited for the project. In the fifth round, the estimation for the project was delivered around Rs 12,000 crore but \u201cwe are building it at around Rs 7,000 crore. So we saved Rs 5,000 crore\u201d.<br \/>\nMEIL is aiming to complete the project by 2028. However, it will continue to operate and maintain the tunnel for a period of five years after commissioning, officials said.<br \/>\nBesides being the longest tunnel project in Asia, Zojila is also among the world\u2019s highest tunnel projects, the officials said.<br \/>\nOver the last five years, the site has witnessed five avalanche incidents, including a severe one in January 2023 when 172 workers stranded in the area were rescued by the Indian Army. Despite these challenges, the project has achieved 10 million safe man-hours, MEIL said.<br \/>\nThe geostrategically important tunnel on the Srinagar-Leh National Highway will provide year-round, all-weather connectivity to Ladakh, reducing the travel time from 1-1.5 hours to 15 minutes, the officials said.<\/p>\n<figure id=\"attachment_38027\" aria-describedby=\"caption-attachment-38027\" style=\"width: 300px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-38027\" src=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1-300x199.jpg\" alt=\"Rs 6,800-Cr Zojila Tunnel Project In J&amp;K Achieves Breakthrough In Excavation Work\" width=\"300\" height=\"199\" srcset=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1-300x199.jpg 300w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1-1024x681.jpg 1024w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1-768x511.jpg 768w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1-549x365.jpg 549w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1-421x280.jpg 421w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1-233x155.jpg 233w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1-230x153.jpg 230w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1-360x239.jpg 360w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1-100x66.jpg 100w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1.jpg 1536w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-38027\" class=\"wp-caption-text\">Rs 6,800-Cr Zojila Tunnel Project In J&amp;K Achieves Breakthrough In Excavation Work<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Drass\/ Minimarg, Jun 9 : The Rs 6,800-crore Zojila tunnel, Asia\u2019s longest tunnel connecting the Kashmir Valley to Ladakh, on Tuesday achieved a significant breakthrough with a blast breaking through the last 2.5 metres of the 13-km high-altitude infrastructure project that cuts through the Himalayas. Union Minister for Road Transport and Highways Nitin Gadkari performed [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":38027,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[15,89],"tags":[],"class_list":["post-38026","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-jammu-and-kashmir","category-national"],"gutentor_comment":0,"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Rs 6,800-Cr Zojila Tunnel Project In J&amp;K Achieves Breakthrough<\/title>\n<meta name=\"description\" content=\"The Rs 6,800-crore Zojila tunnel, Asia\u2019s longest tunnel connecting the Kashmir Valley to Ladakh, on Tuesday achieved a significant\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rs 6,800-Cr Zojila Tunnel Project In J&amp;K Achieves Breakthrough\" \/>\n<meta property=\"og:description\" content=\"The Rs 6,800-crore Zojila tunnel, Asia\u2019s longest tunnel connecting the Kashmir Valley to Ladakh, on Tuesday achieved a significant\" \/>\n<meta property=\"og:url\" content=\"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/\" \/>\n<meta property=\"og:site_name\" content=\"Jammu Bulletin\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/jammubulletinnews\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-09T12:34:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1021\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/\"},\"author\":{\"name\":\"editor\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3\"},\"headline\":\"Rs 6,800-Cr Zojila Tunnel Project In J&#038;K Achieves Breakthrough In Excavation Work\",\"datePublished\":\"2026-06-09T12:34:29+00:00\",\"dateModified\":\"2026-06-09T12:34:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/\"},\"wordCount\":841,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#organization\"},\"articleSection\":[\"Jammu and Kashmir\",\"National\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/\",\"url\":\"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/\",\"name\":\"Rs 6,800-Cr Zojila Tunnel Project In J&K Achieves Breakthrough\",\"isPartOf\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#website\"},\"datePublished\":\"2026-06-09T12:34:29+00:00\",\"dateModified\":\"2026-06-09T12:34:29+00:00\",\"description\":\"The Rs 6,800-crore Zojila tunnel, Asia\u2019s longest tunnel connecting the Kashmir Valley to Ladakh, on Tuesday achieved a significant\",\"breadcrumb\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/jammubulletin.com\/site\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rs 6,800-Cr Zojila Tunnel Project In J&#038;K Achieves Breakthrough In Excavation Work\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#website\",\"url\":\"https:\/\/jammubulletin.com\/site\/\",\"name\":\"Jammu Bulletin\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/jammubulletin.com\/site\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#organization\",\"name\":\"Jammu Bulletin\",\"url\":\"https:\/\/jammubulletin.com\/site\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png\",\"contentUrl\":\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png\",\"width\":344,\"height\":108,\"caption\":\"Jammu Bulletin\"},\"image\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3\",\"name\":\"editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g\",\"caption\":\"editor\"},\"sameAs\":[\"https:\/\/jammubulletin.com\/site\/\",\"https:\/\/www.facebook.com\/jammubulletinnews\",\"https:\/\/www.instagram.com\/jb_jammubulletin\/\",\"https:\/\/www.youtube.com\/channel\/UCiLYegrAWdxNxRIoaKZgw9g\"],\"url\":\"https:\/\/jammubulletin.com\/site\/author\/editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rs 6,800-Cr Zojila Tunnel Project In J&K Achieves Breakthrough","description":"The Rs 6,800-crore Zojila tunnel, Asia\u2019s longest tunnel connecting the Kashmir Valley to Ladakh, on Tuesday achieved a significant","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/","og_locale":"en_US","og_type":"article","og_title":"Rs 6,800-Cr Zojila Tunnel Project In J&K Achieves Breakthrough","og_description":"The Rs 6,800-crore Zojila tunnel, Asia\u2019s longest tunnel connecting the Kashmir Valley to Ladakh, on Tuesday achieved a significant","og_url":"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/","og_site_name":"Jammu Bulletin","article_author":"https:\/\/www.facebook.com\/jammubulletinnews","article_published_time":"2026-06-09T12:34:29+00:00","og_image":[{"width":1536,"height":1021,"url":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2026\/06\/PTI06_09_2026_000219B-1536x1021-1.jpg","type":"image\/jpeg"}],"author":"editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"editor","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/#article","isPartOf":{"@id":"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/"},"author":{"name":"editor","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3"},"headline":"Rs 6,800-Cr Zojila Tunnel Project In J&#038;K Achieves Breakthrough In Excavation Work","datePublished":"2026-06-09T12:34:29+00:00","dateModified":"2026-06-09T12:34:29+00:00","mainEntityOfPage":{"@id":"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/"},"wordCount":841,"commentCount":0,"publisher":{"@id":"https:\/\/jammubulletin.com\/site\/#organization"},"articleSection":["Jammu and Kashmir","National"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/","url":"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/","name":"Rs 6,800-Cr Zojila Tunnel Project In J&K Achieves Breakthrough","isPartOf":{"@id":"https:\/\/jammubulletin.com\/site\/#website"},"datePublished":"2026-06-09T12:34:29+00:00","dateModified":"2026-06-09T12:34:29+00:00","description":"The Rs 6,800-crore Zojila tunnel, Asia\u2019s longest tunnel connecting the Kashmir Valley to Ladakh, on Tuesday achieved a significant","breadcrumb":{"@id":"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/jammubulletin.com\/site\/rs-6800-cr-zojila-tunnel-project-in-jk-achieves-breakthrough-in-excavation-work\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/jammubulletin.com\/site\/"},{"@type":"ListItem","position":2,"name":"Rs 6,800-Cr Zojila Tunnel Project In J&#038;K Achieves Breakthrough In Excavation Work"}]},{"@type":"WebSite","@id":"https:\/\/jammubulletin.com\/site\/#website","url":"https:\/\/jammubulletin.com\/site\/","name":"Jammu Bulletin","description":"","publisher":{"@id":"https:\/\/jammubulletin.com\/site\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/jammubulletin.com\/site\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/jammubulletin.com\/site\/#organization","name":"Jammu Bulletin","url":"https:\/\/jammubulletin.com\/site\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/","url":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png","contentUrl":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png","width":344,"height":108,"caption":"Jammu Bulletin"},"image":{"@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3","name":"editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g","caption":"editor"},"sameAs":["https:\/\/jammubulletin.com\/site\/","https:\/\/www.facebook.com\/jammubulletinnews","https:\/\/www.instagram.com\/jb_jammubulletin\/","https:\/\/www.youtube.com\/channel\/UCiLYegrAWdxNxRIoaKZgw9g"],"url":"https:\/\/jammubulletin.com\/site\/author\/editor\/"}]}},"_links":{"self":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/38026","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/comments?post=38026"}],"version-history":[{"count":1,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/38026\/revisions"}],"predecessor-version":[{"id":38029,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/38026\/revisions\/38029"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/media\/38027"}],"wp:attachment":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/media?parent=38026"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/categories?post=38026"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/tags?post=38026"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}