{"id":29186,"date":"2025-05-18T06:17:27","date_gmt":"2025-05-18T06:17:27","guid":{"rendered":"https:\/\/jammubulletin.com\/site\/?p=29186"},"modified":"2025-05-18T06:17:27","modified_gmt":"2025-05-18T06:17:27","slug":"earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief","status":"publish","type":"post","link":"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/","title":{"rendered":"Earth Observation Mission Could Not Be Accomplished Due To 3rd Stage Pressure Issue: ISRO Chief"},"content":{"rendered":"<p>Sriharikota (Andhra Pradesh), May 18: ISRO\u2019s 101st mission from here, an earth observation satellite onboard the agency\u2019s trusted PSLV rocket, could not be accomplished on Sunday following a pressure issue in the third stage of the launch vehicle, the space agency said.<br \/>\nAlthough the Polar Satellite Launch Vehicle (PSLV) made a textbook lift-off at the prefixed time of 5.59 am, the mission objectives, however could not be achieved.<br \/>\n\u201cToday we targeted the 101st launch from Sriharikota, the PSLV-C61 EOS-09 mission. The PSLV is a four-stage vehicle and up to the second stage, the performance was normal. The third stage motor started perfectly but during the functioning of the third stage we are seeing an observation and the mission could not be accomplished,\u201d Narayanan said.<br \/>\nThe third stage is a solid motor system.<br \/>\n\u201c\u2026and the motor pressure\u2013there was a fall in the chamber pressure of the motor case and the mission could not be accomplished. We are studying the entire performance, we shall come back at the earliest,\u201d Narayanan said post the unsuccessful launch.<br \/>\nEOS-09 is a repeat satellite similar to EOS-04 launched in 2022 that has been designed with the mission objective to ensure remote sensing data for the user community engaged in operational applications and to improve the frequency of observation.<br \/>\nThe mission\u2019s payload, a Synthetic Aperture Radar (SAR) which is inside the satellite is capable of providing images for various earth observation applications under all-weather conditions, day and night.<br \/>\nThis all-weather, round-the-clock imaging is vital for applications ranging from agriculture and forestry monitoring to disaster management, urban planning and national security.<br \/>\nThe mission was aimed to be a debris-free one.<br \/>\nAccording to scientists, a sufficient amount of the fuel had been reserved for de-orbiting the satellite after its effective mission life by lowering it to an orbit that ensures its decay within two years, towards ensuring a debris-free mission.<\/p>\n<figure id=\"attachment_29187\" aria-describedby=\"caption-attachment-29187\" style=\"width: 300px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-29187\" src=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-300x224.jpeg\" alt=\"Earth Observation Mission Could Not Be Accomplished Due To 3rd Stage Pressure Issue: ISRO Chief\" width=\"300\" height=\"224\" srcset=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-300x224.jpeg 300w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-1024x765.jpeg 1024w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-768x574.jpeg 768w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-1536x1148.jpeg 1536w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-2048x1530.jpeg 2048w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-549x410.jpeg 549w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-375x280.jpeg 375w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-233x174.jpeg 233w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-205x153.jpeg 205w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-320x239.jpeg 320w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-100x75.jpeg 100w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1-360x269.jpeg 360w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-29187\" class=\"wp-caption-text\">Earth Observation Mission Could Not Be Accomplished Due To 3rd Stage Pressure Issue: ISRO Chief<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sriharikota (Andhra Pradesh), May 18: ISRO\u2019s 101st mission from here, an earth observation satellite onboard the agency\u2019s trusted PSLV rocket, could not be accomplished on Sunday following a pressure issue in the third stage of the launch vehicle, the space agency said. Although the Polar Satellite Launch Vehicle (PSLV) made a textbook lift-off at the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":29187,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[22,89],"tags":[],"class_list":["post-29186","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-international","category-national"],"gutentor_comment":0,"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Earth obs Mission Could Not Be Accomplished Due To 3rd Stage<\/title>\n<meta name=\"description\" content=\"ISRO\u2019s 101st mission from here, an earth observation satellite onboard the agency\u2019s trusted PSLV rocket,could not be accomplished\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Earth obs Mission Could Not Be Accomplished Due To 3rd Stage\" \/>\n<meta property=\"og:description\" content=\"ISRO\u2019s 101st mission from here, an earth observation satellite onboard the agency\u2019s trusted PSLV rocket,could not be accomplished\" \/>\n<meta property=\"og:url\" content=\"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/\" \/>\n<meta property=\"og:site_name\" content=\"Jammu Bulletin\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/jammubulletinnews\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-18T06:17:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1913\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/\"},\"author\":{\"name\":\"editor\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3\"},\"headline\":\"Earth Observation Mission Could Not Be Accomplished Due To 3rd Stage Pressure Issue: ISRO Chief\",\"datePublished\":\"2025-05-18T06:17:27+00:00\",\"dateModified\":\"2025-05-18T06:17:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/\"},\"wordCount\":350,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#organization\"},\"articleSection\":[\"International\",\"National\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/\",\"url\":\"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/\",\"name\":\"Earth obs Mission Could Not Be Accomplished Due To 3rd Stage\",\"isPartOf\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#website\"},\"datePublished\":\"2025-05-18T06:17:27+00:00\",\"dateModified\":\"2025-05-18T06:17:27+00:00\",\"description\":\"ISRO\u2019s 101st mission from here, an earth observation satellite onboard the agency\u2019s trusted PSLV rocket,could not be accomplished\",\"breadcrumb\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/jammubulletin.com\/site\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Earth Observation Mission Could Not Be Accomplished Due To 3rd Stage Pressure Issue: ISRO Chief\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#website\",\"url\":\"https:\/\/jammubulletin.com\/site\/\",\"name\":\"Jammu Bulletin\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/jammubulletin.com\/site\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#organization\",\"name\":\"Jammu Bulletin\",\"url\":\"https:\/\/jammubulletin.com\/site\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png\",\"contentUrl\":\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png\",\"width\":344,\"height\":108,\"caption\":\"Jammu Bulletin\"},\"image\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3\",\"name\":\"editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g\",\"caption\":\"editor\"},\"sameAs\":[\"https:\/\/jammubulletin.com\/site\/\",\"https:\/\/www.facebook.com\/jammubulletinnews\",\"https:\/\/www.instagram.com\/jb_jammubulletin\/\",\"https:\/\/www.youtube.com\/channel\/UCiLYegrAWdxNxRIoaKZgw9g\"],\"url\":\"https:\/\/jammubulletin.com\/site\/author\/editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Earth obs Mission Could Not Be Accomplished Due To 3rd Stage","description":"ISRO\u2019s 101st mission from here, an earth observation satellite onboard the agency\u2019s trusted PSLV rocket,could not be accomplished","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/","og_locale":"en_US","og_type":"article","og_title":"Earth obs Mission Could Not Be Accomplished Due To 3rd Stage","og_description":"ISRO\u2019s 101st mission from here, an earth observation satellite onboard the agency\u2019s trusted PSLV rocket,could not be accomplished","og_url":"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/","og_site_name":"Jammu Bulletin","article_author":"https:\/\/www.facebook.com\/jammubulletinnews","article_published_time":"2025-05-18T06:17:27+00:00","og_image":[{"width":2560,"height":1913,"url":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/05\/download-4-scaled-1.jpeg","type":"image\/jpeg"}],"author":"editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"editor","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/#article","isPartOf":{"@id":"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/"},"author":{"name":"editor","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3"},"headline":"Earth Observation Mission Could Not Be Accomplished Due To 3rd Stage Pressure Issue: ISRO Chief","datePublished":"2025-05-18T06:17:27+00:00","dateModified":"2025-05-18T06:17:27+00:00","mainEntityOfPage":{"@id":"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/"},"wordCount":350,"commentCount":0,"publisher":{"@id":"https:\/\/jammubulletin.com\/site\/#organization"},"articleSection":["International","National"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/","url":"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/","name":"Earth obs Mission Could Not Be Accomplished Due To 3rd Stage","isPartOf":{"@id":"https:\/\/jammubulletin.com\/site\/#website"},"datePublished":"2025-05-18T06:17:27+00:00","dateModified":"2025-05-18T06:17:27+00:00","description":"ISRO\u2019s 101st mission from here, an earth observation satellite onboard the agency\u2019s trusted PSLV rocket,could not be accomplished","breadcrumb":{"@id":"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/jammubulletin.com\/site\/earth-observation-mission-could-not-be-accomplished-due-to-3rd-stage-pressure-issue-isro-chief\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/jammubulletin.com\/site\/"},{"@type":"ListItem","position":2,"name":"Earth Observation Mission Could Not Be Accomplished Due To 3rd Stage Pressure Issue: ISRO Chief"}]},{"@type":"WebSite","@id":"https:\/\/jammubulletin.com\/site\/#website","url":"https:\/\/jammubulletin.com\/site\/","name":"Jammu Bulletin","description":"","publisher":{"@id":"https:\/\/jammubulletin.com\/site\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/jammubulletin.com\/site\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/jammubulletin.com\/site\/#organization","name":"Jammu Bulletin","url":"https:\/\/jammubulletin.com\/site\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/","url":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png","contentUrl":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png","width":344,"height":108,"caption":"Jammu Bulletin"},"image":{"@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3","name":"editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g","caption":"editor"},"sameAs":["https:\/\/jammubulletin.com\/site\/","https:\/\/www.facebook.com\/jammubulletinnews","https:\/\/www.instagram.com\/jb_jammubulletin\/","https:\/\/www.youtube.com\/channel\/UCiLYegrAWdxNxRIoaKZgw9g"],"url":"https:\/\/jammubulletin.com\/site\/author\/editor\/"}]}},"_links":{"self":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/29186","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/comments?post=29186"}],"version-history":[{"count":1,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/29186\/revisions"}],"predecessor-version":[{"id":29188,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/29186\/revisions\/29188"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/media\/29187"}],"wp:attachment":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/media?parent=29186"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/categories?post=29186"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/tags?post=29186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}