{"id":28475,"date":"2025-04-21T07:31:21","date_gmt":"2025-04-21T07:31:21","guid":{"rendered":"https:\/\/jammubulletin.com\/site\/?p=28475"},"modified":"2025-04-21T07:31:21","modified_gmt":"2025-04-21T07:31:21","slug":"landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days","status":"publish","type":"post","link":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/","title":{"rendered":"Landslide-Hit Jammu-Srinagar NH Remains Closed, Restoration Work May Take Six Days"},"content":{"rendered":"<p>RAMBAN, Apr 21: The landslide-hit Jammu-Srinagar National Highway remained closed for a second day on Monday, with a senior NHAI official saying the road clearance operation, underway at 20 locations, was likely to take about six days.Hundreds of vehicles were left stranded on the strategic 250-kilometre highway \u2014 the only all-weather road linking Kashmir with the rest of the country \u2014 on Sunday after heavy rainfall and cloudbursts triggered flash floods, landslides and mudslides in Jammu and Kashmir\u2019s Ramban district.<br \/>\nThree persons, including two minor siblings, were killed and more than 100 people were rescued as the natural calamity caused massive damage to infrastructure, including roads and residential buildings. A number of vehicles were also buried under the debris.<br \/>\n\u201cWe are faced with a challenging situation due to massive deposits of muck on the highway at more than a dozen places, especially on the four-kilometre stretch between Seri and Maroog. The height of the sludge at some places is more than 20 feet,\u201d National Highways Authority of India (NHAI) project director Purshottam Kumar said.<br \/>\nThe agency\u2019s major machinery, including earth movers, are buried under the debris, he added.<br \/>\n\u201cDespite limited available resources of our own, we have arranged machinery from private contractors and deployed those at 20 affected locations simultaneously to speed up the restoration work,\u201d he said, expressing satisfaction at the improved weather condition after two days of heavy rain.<br \/>\nHowever, Kumar said the highway was likely to take five to six days to reopen for traffic.<br \/>\nThe highway has suffered major damages near Panthiyal and Kela Morh, he added.<br \/>\nMeanwhile, stranded commuters, including two newlywed couples, were seen moving on foot to reach their destinations.<br \/>\n\u201cThe road is destroyed (at a number of places). The situation is very bad,\u201d Rajasthan native Devi Lal, who is heading home from the Magam area of central Kashmir\u2019s Budgam district, told PTI Videos in Ramban.<br \/>\nAccompanied by other members of his community, including women and children, Lal said they were walking to cross the problematic stretches before boarding a bus to Jammu.<br \/>\nJamna, who was carrying a minor child on her shoulders, said stones and boulders were still coming down the hills overlooking the highway and added that the situation was frightening.<br \/>\n\u201cWe have not taken meals for the past two days,\u201d she said as the group made their way to Udhampur.<br \/>\nDressed in their wedding attire, Zahir Ahmad and Zaheera Bano were expecting a smooth ride into their new life together but it turned into an unforgettable journey as the newlywed couple had to walk from the bride\u2019s Chenani home to the groom\u2019s residence in Ramban.<br \/>\n\u201cIt was tiring but, in a way, it made the day even more special,\u201d said Ahmad, adding he wanted no other person to experience such an ordeal.<\/p>\n<figure id=\"attachment_28476\" aria-describedby=\"caption-attachment-28476\" style=\"width: 300px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-28476\" src=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-300x208.jpg\" alt=\"Landslide-Hit Jammu-Srinagar NH Remains Closed, Restoration Work May Take Six Days\" width=\"300\" height=\"208\" srcset=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-300x208.jpg 300w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-1024x710.jpg 1024w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-768x533.jpg 768w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-1536x1065.jpg 1536w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-549x381.jpg 549w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-404x280.jpg 404w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-233x162.jpg 233w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-221x153.jpg 221w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-345x239.jpg 345w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-100x69.jpg 100w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n-360x250.jpg 360w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n.jpg 2048w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-28476\" class=\"wp-caption-text\">Landslide-Hit Jammu-Srinagar NH Remains Closed, Restoration Work May Take Six Days<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>RAMBAN, Apr 21: The landslide-hit Jammu-Srinagar National Highway remained closed for a second day on Monday, with a senior NHAI official saying the road clearance operation, underway at 20 locations, was likely to take about six days.Hundreds of vehicles were left stranded on the strategic 250-kilometre highway \u2014 the only all-weather road linking Kashmir with [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":28476,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[67,15,89],"tags":[],"class_list":["post-28475","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-header","category-jammu-and-kashmir","category-national"],"gutentor_comment":0,"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Landslide-Hit Jammu-Srinagar NH Remains Closed<\/title>\n<meta name=\"description\" content=\": The landslide-hit Jammu-Srinagar National Highway remained closed for a second day on Monday, with a senior NHAI\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Landslide-Hit Jammu-Srinagar NH Remains Closed\" \/>\n<meta property=\"og:description\" content=\": The landslide-hit Jammu-Srinagar National Highway remained closed for a second day on Monday, with a senior NHAI\" \/>\n<meta property=\"og:url\" content=\"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/\" \/>\n<meta property=\"og:site_name\" content=\"Jammu Bulletin\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/jammubulletinnews\" \/>\n<meta property=\"article:published_time\" content=\"2025-04-21T07:31:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1420\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/\"},\"author\":{\"name\":\"editor\",\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/#\\\/schema\\\/person\\\/f3c17a1937e1f28a8046d670255ba6c3\"},\"headline\":\"Landslide-Hit Jammu-Srinagar NH Remains Closed, Restoration Work May Take Six Days\",\"datePublished\":\"2025-04-21T07:31:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/\"},\"wordCount\":490,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/492098422_1080949247403286_6244662049681622314_n.jpg\",\"articleSection\":[\"header\",\"Jammu and Kashmir\",\"National\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/\",\"url\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/\",\"name\":\"Landslide-Hit Jammu-Srinagar NH Remains Closed\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/492098422_1080949247403286_6244662049681622314_n.jpg\",\"datePublished\":\"2025-04-21T07:31:21+00:00\",\"description\":\": The landslide-hit Jammu-Srinagar National Highway remained closed for a second day on Monday, with a senior NHAI\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/#primaryimage\",\"url\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/492098422_1080949247403286_6244662049681622314_n.jpg\",\"contentUrl\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/492098422_1080949247403286_6244662049681622314_n.jpg\",\"width\":2048,\"height\":1420,\"caption\":\"Landslide-Hit Jammu-Srinagar NH Remains Closed, Restoration Work May Take Six Days\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Landslide-Hit Jammu-Srinagar NH Remains Closed, Restoration Work May Take Six Days\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/#website\",\"url\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/\",\"name\":\"Jammu Bulletin\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/#organization\",\"name\":\"Jammu Bulletin\",\"url\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/logo.png\",\"width\":344,\"height\":108,\"caption\":\"Jammu Bulletin\"},\"image\":{\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/#\\\/schema\\\/person\\\/f3c17a1937e1f28a8046d670255ba6c3\",\"name\":\"editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g\",\"caption\":\"editor\"},\"sameAs\":[\"https:\\\/\\\/jammubulletin.com\\\/site\\\/\",\"https:\\\/\\\/www.facebook.com\\\/jammubulletinnews\",\"https:\\\/\\\/www.instagram.com\\\/jb_jammubulletin\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCiLYegrAWdxNxRIoaKZgw9g\"],\"url\":\"https:\\\/\\\/jammubulletin.com\\\/site\\\/author\\\/editor\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Landslide-Hit Jammu-Srinagar NH Remains Closed","description":": The landslide-hit Jammu-Srinagar National Highway remained closed for a second day on Monday, with a senior NHAI","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/","og_locale":"en_US","og_type":"article","og_title":"Landslide-Hit Jammu-Srinagar NH Remains Closed","og_description":": The landslide-hit Jammu-Srinagar National Highway remained closed for a second day on Monday, with a senior NHAI","og_url":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/","og_site_name":"Jammu Bulletin","article_author":"https:\/\/www.facebook.com\/jammubulletinnews","article_published_time":"2025-04-21T07:31:21+00:00","og_image":[{"width":2048,"height":1420,"url":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n.jpg","type":"image\/jpeg"}],"author":"editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"editor","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/#article","isPartOf":{"@id":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/"},"author":{"name":"editor","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3"},"headline":"Landslide-Hit Jammu-Srinagar NH Remains Closed, Restoration Work May Take Six Days","datePublished":"2025-04-21T07:31:21+00:00","mainEntityOfPage":{"@id":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/"},"wordCount":490,"commentCount":0,"publisher":{"@id":"https:\/\/jammubulletin.com\/site\/#organization"},"image":{"@id":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/#primaryimage"},"thumbnailUrl":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n.jpg","articleSection":["header","Jammu and Kashmir","National"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/","url":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/","name":"Landslide-Hit Jammu-Srinagar NH Remains Closed","isPartOf":{"@id":"https:\/\/jammubulletin.com\/site\/#website"},"primaryImageOfPage":{"@id":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/#primaryimage"},"image":{"@id":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/#primaryimage"},"thumbnailUrl":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n.jpg","datePublished":"2025-04-21T07:31:21+00:00","description":": The landslide-hit Jammu-Srinagar National Highway remained closed for a second day on Monday, with a senior NHAI","breadcrumb":{"@id":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/#primaryimage","url":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n.jpg","contentUrl":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2025\/04\/492098422_1080949247403286_6244662049681622314_n.jpg","width":2048,"height":1420,"caption":"Landslide-Hit Jammu-Srinagar NH Remains Closed, Restoration Work May Take Six Days"},{"@type":"BreadcrumbList","@id":"https:\/\/jammubulletin.com\/site\/landslide-hit-jammu-srinagar-nh-remains-closed-restoration-work-may-take-six-days\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/jammubulletin.com\/site\/"},{"@type":"ListItem","position":2,"name":"Landslide-Hit Jammu-Srinagar NH Remains Closed, Restoration Work May Take Six Days"}]},{"@type":"WebSite","@id":"https:\/\/jammubulletin.com\/site\/#website","url":"https:\/\/jammubulletin.com\/site\/","name":"Jammu Bulletin","description":"","publisher":{"@id":"https:\/\/jammubulletin.com\/site\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/jammubulletin.com\/site\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/jammubulletin.com\/site\/#organization","name":"Jammu Bulletin","url":"https:\/\/jammubulletin.com\/site\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/","url":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png","contentUrl":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png","width":344,"height":108,"caption":"Jammu Bulletin"},"image":{"@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3","name":"editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g","caption":"editor"},"sameAs":["https:\/\/jammubulletin.com\/site\/","https:\/\/www.facebook.com\/jammubulletinnews","https:\/\/www.instagram.com\/jb_jammubulletin\/","https:\/\/www.youtube.com\/channel\/UCiLYegrAWdxNxRIoaKZgw9g"],"url":"https:\/\/jammubulletin.com\/site\/author\/editor\/"}]}},"_links":{"self":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/28475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/comments?post=28475"}],"version-history":[{"count":1,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/28475\/revisions"}],"predecessor-version":[{"id":28477,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/28475\/revisions\/28477"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/media\/28476"}],"wp:attachment":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/media?parent=28475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/categories?post=28475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/tags?post=28475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}