{"id":20854,"date":"2024-08-01T11:18:13","date_gmt":"2024-08-01T11:18:13","guid":{"rendered":"https:\/\/jammubulletin.com\/site\/?p=20854"},"modified":"2024-08-01T11:18:13","modified_gmt":"2024-08-01T11:18:13","slug":"kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply","status":"publish","type":"post","link":"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/","title":{"rendered":"KPDCL set to install meters on 40,000 DTs, 1400 Feeders for reliable power supply"},"content":{"rendered":"<p>Will facilitate real-time monitoring of electrical system, address load and voltage unbalancing<br \/>\nSRINAGAR, AUGUST 01: In order to protect distribution transformers (DTs) from damage and curb power losses, <a href=\"https:\/\/jammubulletin.com\/site\/kpdcl-disconnects-thousands-of-non-paying-consumers-1134-connections-snapped-in-esd-chanapora-680-in-esds-baramulla-i-ii-228-in-qazigund\/\">Kashmir Power Distribution Corporation Limited<\/a> (KPDCL) is installing 40,000 DT meters &amp; 1200 feeder meters under the premier loss reduction scheme of RDSS.<br \/>\nThis shall be besides 6.85 lakh consumer smart meters which shall be installed in unmetered flat-rate areas as well those areas where conventional meters have been installed in Kashmir Division over the next 27 months.<br \/>\nGiving details in a press release issued here today, a KPDCL spokesperson stated that DT &amp; Feeder metering shall facilitate real-time monitoring of electrical system, paving way for reliable power supply to the consumers by way of remote monitoring of load and voltage unbalancing. \u201cInstallation of feeder meters shall help us in better load forecasting and relay information regarding duration and interruptions in electricity supply in digital mode,\u201d he added.<br \/>\n340 feeders have already been integrated with National Feeder Monitoring System (NFMS) while the rest of the feeders will be covered under RDSS.<br \/>\nIn a big relief to domestic consumers, living in flat-rate areas and areas where conventional\/ non-communicating meters are installed, to cut down on their consumer bills, Kashmir DISCOM is set to install 6.85 lakh smart meters under RDSS to give option of digital monitoring of their consumption and daily billing trajectory to the consumers. \u201cAll these smart meters will be prepaid-enabled and will provide more accurate and real-time consumption details, ushering in a new era of uninterrupted and quality power supply,\u201d he said, adding consumers will be able to check energy consumed on their mobile phones.<br \/>\nKPDCL spokesman further stated that the executing agency is under process of formulation of Project Implementation Plan for smart metering in uncovered areas. \u201cAlready under PMDP, over 3.00 lakh smart meters have been installed with nearly 1.20 lakh meters operating in prepaid mode, giving consumers the opportunity to monitor their daily consumption and billing options,\u201d he added.<\/p>\n<figure id=\"attachment_20855\" aria-describedby=\"caption-attachment-20855\" style=\"width: 189px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-20855\" src=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44-189x300.jpeg\" alt=\"KPDCL set to install meters on 40,000 DTs, 1400 Feeders for reliable power supply\" width=\"189\" height=\"300\" srcset=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44-189x300.jpeg 189w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44-647x1024.jpeg 647w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44-768x1216.jpeg 768w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44-294x465.jpeg 294w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44-177x280.jpeg 177w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44-115x182.jpeg 115w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44-97x153.jpeg 97w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44-151x239.jpeg 151w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44-47x75.jpeg 47w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44-215x340.jpeg 215w, https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44.jpeg 867w\" sizes=\"auto, (max-width: 189px) 100vw, 189px\" \/><figcaption id=\"caption-attachment-20855\" class=\"wp-caption-text\">KPDCL set to install meters on 40,000 DTs, 1400 Feeders for reliable power supply<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Will facilitate real-time monitoring of electrical system, address load and voltage unbalancing SRINAGAR, AUGUST 01: In order to protect distribution transformers (DTs) from damage and curb power losses, Kashmir Power Distribution Corporation Limited (KPDCL) is installing 40,000 DT meters &amp; 1200 feeder meters under the premier loss reduction scheme of RDSS. This shall be besides [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":20855,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[6,15,89],"tags":[],"class_list":["post-20854","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","category-jammu-and-kashmir","category-national"],"gutentor_comment":0,"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>KPDCL set to install meters on 40,000 DTs,1400 Feeders for power<\/title>\n<meta name=\"description\" content=\"In order to protect distribution transformers (DTs) from damage and curb power losses, Kashmir Power Distribution Corporation Limited\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KPDCL set to install meters on 40,000 DTs,1400 Feeders for power\" \/>\n<meta property=\"og:description\" content=\"In order to protect distribution transformers (DTs) from damage and curb power losses, Kashmir Power Distribution Corporation Limited\" \/>\n<meta property=\"og:url\" content=\"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/\" \/>\n<meta property=\"og:site_name\" content=\"Jammu Bulletin\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/jammubulletinnews\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-01T11:18:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"867\" \/>\n\t<meta property=\"og:image:height\" content=\"1373\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/\"},\"author\":{\"name\":\"editor\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3\"},\"headline\":\"KPDCL set to install meters on 40,000 DTs, 1400 Feeders for reliable power supply\",\"datePublished\":\"2024-08-01T11:18:13+00:00\",\"dateModified\":\"2024-08-01T11:18:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/\"},\"wordCount\":354,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#organization\"},\"articleSection\":[\"Business\",\"Jammu and Kashmir\",\"National\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/\",\"url\":\"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/\",\"name\":\"KPDCL set to install meters on 40,000 DTs,1400 Feeders for power\",\"isPartOf\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#website\"},\"datePublished\":\"2024-08-01T11:18:13+00:00\",\"dateModified\":\"2024-08-01T11:18:13+00:00\",\"description\":\"In order to protect distribution transformers (DTs) from damage and curb power losses, Kashmir Power Distribution Corporation Limited\",\"breadcrumb\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/jammubulletin.com\/site\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"KPDCL set to install meters on 40,000 DTs, 1400 Feeders for reliable power supply\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#website\",\"url\":\"https:\/\/jammubulletin.com\/site\/\",\"name\":\"Jammu Bulletin\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/jammubulletin.com\/site\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#organization\",\"name\":\"Jammu Bulletin\",\"url\":\"https:\/\/jammubulletin.com\/site\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png\",\"contentUrl\":\"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png\",\"width\":344,\"height\":108,\"caption\":\"Jammu Bulletin\"},\"image\":{\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3\",\"name\":\"editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g\",\"caption\":\"editor\"},\"sameAs\":[\"https:\/\/jammubulletin.com\/site\/\",\"https:\/\/www.facebook.com\/jammubulletinnews\",\"https:\/\/www.instagram.com\/jb_jammubulletin\/\",\"https:\/\/www.youtube.com\/channel\/UCiLYegrAWdxNxRIoaKZgw9g\"],\"url\":\"https:\/\/jammubulletin.com\/site\/author\/editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"KPDCL set to install meters on 40,000 DTs,1400 Feeders for power","description":"In order to protect distribution transformers (DTs) from damage and curb power losses, Kashmir Power Distribution Corporation Limited","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/","og_locale":"en_US","og_type":"article","og_title":"KPDCL set to install meters on 40,000 DTs,1400 Feeders for power","og_description":"In order to protect distribution transformers (DTs) from damage and curb power losses, Kashmir Power Distribution Corporation Limited","og_url":"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/","og_site_name":"Jammu Bulletin","article_author":"https:\/\/www.facebook.com\/jammubulletinnews","article_published_time":"2024-08-01T11:18:13+00:00","og_image":[{"width":867,"height":1373,"url":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2024\/08\/WhatsApp-Image-2024-08-01-at-16.43.44.jpeg","type":"image\/jpeg"}],"author":"editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"editor","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/#article","isPartOf":{"@id":"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/"},"author":{"name":"editor","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3"},"headline":"KPDCL set to install meters on 40,000 DTs, 1400 Feeders for reliable power supply","datePublished":"2024-08-01T11:18:13+00:00","dateModified":"2024-08-01T11:18:13+00:00","mainEntityOfPage":{"@id":"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/"},"wordCount":354,"commentCount":0,"publisher":{"@id":"https:\/\/jammubulletin.com\/site\/#organization"},"articleSection":["Business","Jammu and Kashmir","National"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/","url":"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/","name":"KPDCL set to install meters on 40,000 DTs,1400 Feeders for power","isPartOf":{"@id":"https:\/\/jammubulletin.com\/site\/#website"},"datePublished":"2024-08-01T11:18:13+00:00","dateModified":"2024-08-01T11:18:13+00:00","description":"In order to protect distribution transformers (DTs) from damage and curb power losses, Kashmir Power Distribution Corporation Limited","breadcrumb":{"@id":"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/jammubulletin.com\/site\/kpdcl-set-to-install-meters-on-40000-dts-1400-feeders-for-reliable-power-supply\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/jammubulletin.com\/site\/"},{"@type":"ListItem","position":2,"name":"KPDCL set to install meters on 40,000 DTs, 1400 Feeders for reliable power supply"}]},{"@type":"WebSite","@id":"https:\/\/jammubulletin.com\/site\/#website","url":"https:\/\/jammubulletin.com\/site\/","name":"Jammu Bulletin","description":"","publisher":{"@id":"https:\/\/jammubulletin.com\/site\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/jammubulletin.com\/site\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/jammubulletin.com\/site\/#organization","name":"Jammu Bulletin","url":"https:\/\/jammubulletin.com\/site\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/","url":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png","contentUrl":"https:\/\/jammubulletin.com\/site\/wp-content\/uploads\/2021\/08\/logo.png","width":344,"height":108,"caption":"Jammu Bulletin"},"image":{"@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/f3c17a1937e1f28a8046d670255ba6c3","name":"editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/jammubulletin.com\/site\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fce50f360965fb46cb0a9192cc434c1c9526d30ad06a140ea461e7419b3830af?s=96&d=mm&r=g","caption":"editor"},"sameAs":["https:\/\/jammubulletin.com\/site\/","https:\/\/www.facebook.com\/jammubulletinnews","https:\/\/www.instagram.com\/jb_jammubulletin\/","https:\/\/www.youtube.com\/channel\/UCiLYegrAWdxNxRIoaKZgw9g"],"url":"https:\/\/jammubulletin.com\/site\/author\/editor\/"}]}},"_links":{"self":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/20854","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/comments?post=20854"}],"version-history":[{"count":1,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/20854\/revisions"}],"predecessor-version":[{"id":20856,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/posts\/20854\/revisions\/20856"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/media\/20855"}],"wp:attachment":[{"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/media?parent=20854"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/categories?post=20854"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jammubulletin.com\/site\/wp-json\/wp\/v2\/tags?post=20854"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}